Request a demoTalk to Nova
  1. Sourcy
  2. Blog
  3. Florida Bid Watch
  4. Florida Bid Watch Nov 18: CDD Engineer RFQ and FBC Vesting
Florida Bid Watch

Florida Bid Watch Nov 18: CDD Engineer RFQ and FBC Vesting

A continuing District Engineer RFQ in Manatee County, the permit rule that locks your code edition before Dec 31, and a Palm Beach geotech acquisition.

Florida Bid Watch

In short

  • West Manatee District CDD seeks a continuing District Engineer under CCNA: questions by Nov 30 at noon, SF-330 due Dec 4 at 5 p.m.
  • Applicants must be available to present at the Dec 15 Board meeting in Sarasota.
  • Under s.553.73(7)(d), F.S., the permit application date, not a zoning approval, sets which Florida Building Code edition applies.
  • Certerra acquired TSFGeo, a West Palm Beach geotechnical, testing and inspection firm founded in 2000.
On this page
  1. Open now
  2. Industry news
  3. One thing to do this week

This week's short list: one continuing District Engineer RFQ in Manatee County with a December 4 deadline, a reminder that only a building permit application locks your Florida Building Code edition before the 9th Edition arrives on December 31, and a West Palm Beach geotechnical firm joining a larger platform.

Open now

West Manatee District CDD: continuing District Engineer (RFQ)

The West Manatee District Community Development District, in Manatee County, is asking for qualifications from firms to provide professional engineering services on a continuing basis and to act as District Engineer. The work covers public improvements such as earthwork, stormwater, landscape, irrigation, signage and preserve areas. The District will review applicants under the Consultants' Competitive Negotiation Act (CCNA), and the qualification statement goes on Standard Form 330.

  • Questions: by email only, no later than 12:00 p.m. on November 30, 2026.
  • Submittals: by 5:00 p.m. on December 4, 2026, one original plus one electronic copy (PDF on a USB flash drive), delivered to the District Manager's office in Orlando.
  • Presentation: applicants must be available to present at the December 15, 2026 Board meeting in Sarasota. The notice says the date may change, so confirm the time with the District Manager.

Read the official notice (Florida Public Notices, published Nov 15, 2026).

What it means for your firm: a CDD District Engineer role is recurring work, and the presentation step is where small firms win or lose it. If you pursue this one, build the SF-330 around similar district work you have already done and pick your presenter now, not on December 14.

Industry news

Your permit application, not your zoning approval, locks the code edition

The 9th Edition (2026) Florida Building Code is scheduled to take effect on December 31, 2026. A November 10 alert from the law firm Greenberg Traurig reminds owners and design teams of a point that is easy to miss in a busy pipeline: zoning and other entitlement approvals do not, by themselves, lock in the current code edition. Read the Greenberg Traurig alert.

The rule comes from Florida Statutes section 553.73(7)(d): the edition of the Florida Building Code in effect on the date of application for a permit governs the permitted work for the life of the permit and any extension. Read section 553.73, Florida Statutes. The alert also notes that each local building department sets its own minimum submittal requirements, which decide when an application counts as submitted.

What it means for your firm: list every project in design that has a site plan or zoning approval but no building permit application yet. For each one, confirm with the client and the local building department whether you will file under the 8th Edition before the cutoff or design to the 9th. We covered the Miami-Dade and Tampa cutoff notices last week.

Certerra acquires TSFGeo

Certerra, a portfolio company of OceanSound Partners, announced on November 12 that it acquired Tierra South Florida, Inc. (TSFGeo), a West Palm Beach firm founded in 2000 that provides geotechnical engineering, construction materials testing and inspection services. Congratulations to the TSFGeo team on this next chapter. Read the announcement.

What it means for your firm: if TSFGeo is a subconsultant on a team you have submitted or are about to submit, check that the firm name, key personnel and license information in your SF-330 still match before the selection committee meets.

One thing to do this week

Open your pipeline list and mark two columns for every active project: "permit application filed (date)" and "CCNA or continuing contract deadline." Twenty minutes now saves a code-edition surprise in January and a missed submittal in December.

Get Florida Bid Watch every Wednesday. Sign up on this page and we will send you the week's bids, awards and industry news, each one linked to its official notice.

About the author

Camila Duarte

Digital Strategist

Digital Strategist at Sourcy. I listen to what agency owners and engineering and convert the into practical information they could use for their business.

Get new Sourcy articles in your inbox

At most one email a week: practical AI for insurance, architecture & engineering, and construction teams. No spam.

By subscribing you agree to receive the Sourcy Blog newsletter. Unsubscribe anytime. See our Privacy Policy.

Want this working in your business?

We map one workflow with your team, implement it and stay with you until it runs in production.

Get a quote
Text us, send documents, photos or videos